- The (8/0) mile Pyay-Aung Lan-Magway section was upgraded to a 24-foot wide (2) lane bituminous road.
- Yangon-Bago Road (4/3) miles wide asphalt concrete road upgraded.
- The (2/2) mile of Road No-(3) was widened to 74 feet wide, (6) lanes, and concrete pavement.
- The (4/4) mile of No-(2) Road was upgraded to a 24-foot wide, (2) lane, asphalt concrete road.
- 17/5 miles of Yangon-Pyay Road, Taikkyi - Thayarwaddy section was upgraded to a 48-foot wide 4-lane concrete road
- 10/1 mile of Dagon-Thilawa Road was upgraded to a 48-foot wide 4-lane concrete road.
- 23/0 mile of (No,2) road was upgraded to a 4-lane concrete road with a width of 48 feet.
- 14/6 mile section of Thayarwaddy-Pyay road was upgraded to a 24-foot wide 2-lane bituminous road.
- Pyay-Aunglan-Magway section 47/5 miles was upgraded to a 24-foot wide 2-lane bituminous road.
- 6/4 mile of (No,4)road was upgraded and expanded into a 4-lane concrete road with a width of 48 feet.
- 4/2 mile section of Pyay-Aunglan-Magway Road was upgraded to a 48-foot-wide 4-lane asphalt road.
- The 18/5 mile section of Yangon-Pyay road, Taikkyi - Thayarwaddy, was upgraded to a 4-lane concrete road with a width of 48 feet. Moreover, 7/6 miles were upgraded to 48 feet wide 4 lanes and 3/0 miles were upgraded to 24 feet wide 2 lanes asphalt concrete roads.
- The 37/0 mile section of Thayarwaddy-Pyay road was upgraded to a 2-lane asphalt concrete road with a width of 24 feet.
- 5/6 mile of Yangon - Bago Road from 27/7 to 33/5 was upgraded to a 24 feet wide asphalt concrete road.
- Yangon-Pyay Road, Htauk Kyant-Hmawbi Taikkyi road, 23/1 mile was upgraded to a 48 foot wide 4 lane asphalt concrete road.
- 97/2 mile, section of Thayrawati-Pyay road was upgraded to 24-foot wide 2-lane concrete road.
Thanlyin (Payer Kone) - Kyauktan Road, 6/4 miles from 4/4 to 11/0 26 feet wide and From 11/0 to 12/6, 1/6 mile was upgraded to 32 feet wide. Pyay-Aung Lan-Magwe road was upgraded from 1/5 mile to a 4-lane asphalt concrete road with a width of 46 feet.
27/7 miles of Yangon-Bago road from 0/0 to 27/7 and Bago city road was upgraded to a 72 feet wide, asphalt concrete road.
Upgrade of No.3 Main Road, doubling its width from 24 feet to a four-laned 48 feetwide road. The project began in 2014, and successfully completed in 2015.
Start of No.4 Main Road (6/4) mile project, and Yangon-Pyay-Magway Highway (307/4) mile project
Start of Dagon-Thilawa Road (13/5) mile project, and Thanlyin-Kyauktan Road segment (8/2) mile project
Start of No.2 Main Road (23/0) mile project, and No.3 Main Road (9/2) mile project.
Establishment of Max Highway Start of Yangon-Bago highway segment (32/6) project.