Home ➤ Network & Footprint

Network & Footprint

Max Highway’s commitment to road construction goes beyond bricks and asphalt. We’re elevating roads, expanding their reach, and connecting communities across Myanmar. Our wider and more efficient road network links rural and urban areas, fostering commerce, development, and the exchange of knowledge. Through the B.O.T system, we efficiently collect toll gate fees for the Ministry of Construction. Notable networks like Yangon-Bago and Yangon-Pyay-Magway are lifelines connecting the mid-west delta regions.

Max Highway isn’t just about roads; we’re about creating opportunities. We’re proud to support job creation for local residents, contributing to the nation’s socio-economic growth. We are also working on paving the way for a cashless payment system, ensuring smoother traffic flow and convenience for everyone.

B.OT. Contract No. Road Name Road Length Operation Date
B.O.T – l
1
Htauk Kyant – Bago Road
38 Mile 4 Furlongs
1.4.2008
2
Bago Downtown Road
B.O.T – 2
1
No (2) Road
34 Mile 1 Furlongs
1.4.2009
2
No (3) Road
3
Htauk Kyant By Pass Road
B.O.T – 3
1
Yangon – Pyay Magway
341 Mile 2 Furlongs
1.4.2011
2
Koepin – Sanmagyi – Thiyarkauk Road
3
Pyay Downtown Road
4
No (4) Road
B.O.T — 4
1
Dagon – Thilawa Road
21 Mile 7 Furlongs
1.9.2010
2
Thanlyin – Kyauktan Road